Requirement review
Confirm critical dimensions, functions, finish and packing before sampling.
Quality ledger / six controls
Quality is managed across material, construction, function and packing—not left for one inspection at the end.
01 / Production control path
Confirm critical dimensions, functions, finish and packing before sampling.
Review appearance, color and specification before bulk cutting.
Lock the approved construction reference for the production team.
Monitor workmanship and correct issues during assembly.
Check appearance, function, quantity and agreed requirements.
Verify labels, packing method, carton marks and dispatch readiness.

On the production floor
A team member checks finished bags beside a production batch before packing.
02 / Sample-level evidence
Selected submitted components were tested against substance limits referenced by EU RoHS 2011/65/EU and (EU) 2015/863. The reports apply to those samples only; the requirements for a new bag order are confirmed separately.
Reports dated 18 September 2026. RoHS is a directive for electrical and electronic equipment; these test results do not certify every bag or material. Full reports can be discussed for the relevant project.
03 / Original document extracts
These are selected pages from the four reports above. Open a page to read the original text at full size. Each result applies only to the tested sample.
Leather sampleReport SFT260909126149-01E · Page 1 / 9View page ↗
Fabric lining sampleReport SFT260909126149-02E · Page 1 / 9View page ↗
Zipper teeth sampleReport SFT260909126149-03E · Page 1 / 9View page ↗
Metal hardware salt sprayReport SFT260909126149-05E · Page 2 / 4View page ↗Page images are excerpts, not complete test reports. Test conclusions and conditions should be read in the context of the complete reports and the specific submitted samples.
Share your market requirements and testing expectations early so they can be built into the development plan.
Review requirements